Project Description
Construct four new concrete pavements to support prefabricated B-2 Bomber Shelter Systems (B-2SS). Each apron is approximately 40 m by 76 m with a pavement structure consisting of 520 mm of non-reinforced PCC and 300 mm of base course. Jointing and striping included in work. Each apron is surrounded by a concrete shoulder that has a pavement structure consisting of 150 mm of non-reinforced PCC and 150 mm of a base course. The project also includes installation of a new substation building to house a transformer and electrical switchgear, and the relocation of existing utilities; i.e., water lines, fire hydrants, electrical ducts, drainage swales, and incidental related work.
This project involves the construction of four Portland cement concrete (PCC) aprons to support prefabricated B-2 Bomber Shelter Systems (B-2SS) that will be installed under a separate project. Each apron is approximately 40 m by 76 m with a pavement structure consisting of 520 mm of non-reinforced PCC and 300 mm of base course. Each apron will be surrounded by a PCC shoulder that has a pavement structure consisting of 150 mm of non-reinforced PCC and 150 mm of base course. The project also includes installation of a new substation building that will house a transformer and switchgear. In addition, the project will include the relocation of existing utilities including water lines, fire hydrants, electrical ducts, drainage swales, and incidental related work.
Contract Number
TBA
Contract Name
TBA
Location
Construct B2 Aircraft Parking Aprons, Project J, Diego Garcia, B.I.O.T (B2 Parking Apron)