Project Description

The work for this project will repair existing revetment and restore portions of the shoreline to protect threatened infrastructure along the approximately 390 feet of shoreline fronting BOQ-7. Repair includes replacing the existing rubble-mound revetment with an engineered revetment consisting of Class A armor stones, Class B under layer stones and geotextiles fabric, and stabilizing portions of existing shoreline corridor with soil backfilling and re-vegetation. This project is design-build. Project challenges include the removal and replacement of the existing rubble mound revetments to reduce the potential for over-excavation and distress to the coral reefs, existing buildings, structures, utilities, pavements and improvements.