Project Description
The project scope consisted of selective demolition of the existing warehouse in order to replace the existing roof structure and roofing system located above the first floor storage warehouse, replace the existing roofing system located above the second floor space, providing asbestos, lead and PCB abatement, repair/replacing structural framework, replacing exterior doors and windows, replacing interior space to accommodate functions such as private offices, open offices, file room, conference room, break room, men’s and women’s restrooms/showers/locker room, janitor’s closet and supporting utility spaces, replacing plumbing, mechanical, electrical, telecommunication, fire suppression, and fire alarm systems, replacing the electrical vault and secure storage, repair and resealing the warehouse concrete floor slab, repair/replacing selective portions of exterior concrete and CMU wall, and installation of a mass notification system.
Contract Number
Contract Name
Location
Shipping and Receiving General Purpose Warehouse, Kwajalein Atoll